2018
- Thermal tests with the communications card (qualification).
- Thermal testing of the E-BOX (qualification). a
- Thermal design modifications and integration of solutions.
- Finalisation of flight cabling.
- Arrangements for launch opportunity.
- Flight model testing of on-board communications equipment.
- Communications system integration.
- Arrangements for launch opportunity.
- Design and manufacture of separation system accessories.
- Preparation of transport containers.
- Preparation of Flight Model (FM) test procedures.
- Preparation of Flight Model (FM) test fixtures.
- Flight Model (FM) integration.
- Calibration of the ADCS system (magnetometers) in the Flight Model (FM).
- Preparation of bills of materials, parts and processes.
- Preparation of launch documentation.
2017
- Arrangements to obtain launching opportunity.
- Design and assembly of the ground station.
- Testing of the engineering model (EM) of the communications equipment.
- Mechanical testing of the MTS payload (Iberespacio).
- Design and manufacture of the separation connector.
- Development of structural calculation SW (bolt calculation).
- Arrangements to obtain launch opportunity.
- Battery supervision.
- Thermal tests of the communications board.
- Tests with the AOCS SW.
- E-BOX surface finishes.
- Separation system study.
- Functional testing of solar panels on flight wiring.
- Structural design of vibrator tooling.
- Wiring tests.
- E-BOX mechanical tests (qualification).
- Flight SW development.
- Ground station SW development.
2016
- Assembly and testing of the Engineering Model (EM).
- Calibration of the on-board solar sensors.
- Calibration of on-board temperature sensors.
- Design and development of the wiring.
- Purchase of a vibrator for testing.
- Integration and testing of the solar panels.
- Battery maintenance service.
- Manufacture of the flight model (FM) structure components.
- Development of the communications system.
- Testing of the payload elements.
- Development of the thermal model.
- Battery monitoring.
- Development of SW for the satellite.